Research Tool

June 15, 2015

Fleet-Level Selective Maintenance and Aircraft Scheduling – YR1 UA03-AFRL3

The goal of this project was to investigate the use of a mathematical modeling methodology for managing the dynamic maintenance planning and sortie scheduling issues of a process.
June 15, 2015

Cellar Tank Piping Network Analysis – UA04-Gallo

This project researches an optimal pipe routing path algorithm and develops an approach for segmenting operations into "suboperations" to improve optimization model tractability.
June 15, 2015

Inventory Models for Intermittent Highly Variable Demand and Safety Stock Adjustments to Meet Desired Service Level Requirements – UA08-INVS

The main goal of this proposed research project is to develop more effective inventory control models for situations involving intermittent highly variable demand and to ensure that planned for target service levels are actually met during operational conditions when using existing inventory models.