Research

June 15, 2015

Warehouse Floor Layout Optimization – MU08-HLMK

Order picking is the most costly activity in a typical distribution center. This project focused on the development of a slotting approach that is based on order sequences. A mathematical model of the problem is formulated and solutions are compared to several heuristics in order to illustrate the value of an order-based slotting approach. Preliminary results on a large scale data set show a picking cost savings between 15-3% over a manual approach.
June 15, 2015

Analysis and Improvement of Stock Inventory Management at Northrop Grumman Newport News (NGNN) – VT08-NG

This project analyzes a stock inventory system of a process and makes further recommendations for improvement.
June 15, 2015

Improvements in Inventory and Forecasting Analysis – CL08-LOCK

The goal for this project is to analyze current forecasting methods used in a process, to improve forecasting and inventory management techniques and to develop a prototype decision support system (DSS) that provide benchmarks of changes made.
June 15, 2015

Forecasting Transformer Usage During Energy Delivery – MU08-AMUE

This project develops a dynamic forcasting model for everyday inventory control.
June 15, 2015

Technological and Economic Evaluation of Competitive RFID and Other Automatic Identification Technologies for Asset Tracking in Tinker AFB Ramps – OSU07-ALC

Technological and economic analysis of inserting alternative Automatic identification technologies (AITs), including Radio Frequency Identification (RFID) and other wireless sensor networks towards improving a process.
June 15, 2015

Photocatalytic Degradation of Trinitrotoluene – OSU08-DAC

Sponsor: U.S. Army Defense Ammunition Center Research Team: James Harmon Universities Involved: Oklahoma State University Start Date: 01/01/07 End Date: 12/31/10 Summary: The remediation of surplus nitro-aromatic explosives is key to alleviating the task of storing increasing stockpiles of out-of-specification munitions. The focus of this project is the design of […]
June 15, 2015

Patient Discharge Process Improvement Project: Phase 2 – TT10-MCH

This project identifies delays in a process and develops a method to ultimatley improve routing and scheduling
June 15, 2015

The Human Factors Analysis of Queensland Mining Accidents – CL08-QNLD

Sponsor: Queensland Department of Mines and Energy Research Team: Scott Shappell Universities Involved: Clemson University Start Date: 03/01/08 End Date: 02/28/09 Summary: To date, little research has been done on the causes of human error in mining. With the inherent risks associated with mining, preventing errors before they occur will […]
June 15, 2015

Data Reduction by Generalized Graph Domination – OSU10-ENTR

This project reduces a massive data-set to a manageable size without significant loss of information through a graph-based data mining approach.
June 15, 2015

Performance Testing for PBSY and RBD Cottonseed Oils Blended with Biodiesel Methyl-esters – TT06/07-NCPA I

This project creates a representative cost model that can be used in later work to explore the cost feasibility of a process.
June 15, 2015

Scientific Approach to Crew Rest and Duty Restrictions in Commercial Space Flight – CL07-AERO

Sponsor: Federal Aviation Administration (Aerospace) Research Team: Scott Shappell, Jaclyn Baron, Michael Sawyer, Paris F. Stringfellow, Rebecca Iden, Katie Berry, Carlos Oliveira Universities Involved: Clemson University Start Date: 02/01/07 End Date: 02/01/08 Summary: The commercial space industry will operate in a 24-hour, 7-day per week environment. As such, it is […]
June 15, 2015

Phase II: A Scientific Approach to Crew Rest and Duty Restrictions in Commercial Space Flight – CL08-AERO

This project studies the impact of shiftwork on a process
June 15, 2015

Logistics Analysis of the Port of Guaymas in the Supply Chain of Regional Companies – AZ08-PORT

This project analysis the effects in a process when implementing a regular container service in a specific port.
June 15, 2015

Fleet Optimization to Support Barge Operations – UL02-02 ACBL

Use o Linear Programming to minimize the cost of a process meeting the constraints of this process.
June 15, 2015

Item File Accuracy – UA09-WM

This project's objective is to improve Item File Accuracy and the ability to make decisions based on these files, as well as having a process that is user friendly in reviewing the data.
June 15, 2015

Equipment Scheduling and Optimization Phase 2 – OSU06-HLBT

This project develops an optimization model to minimize the cost of a process including its respective constraints.
June 15, 2015

Results of Experimentation with a Decision Support System for Workforce Planning at Louisville MetroSafe – UL07-MTRO

This project is on the scheduling of employees of a specific department using a decision support system (DSS) and an optimization tool software for workforce planning.
June 15, 2015

UPS INTEGRAD: Safety Training System for Driver Service Providers – VT08-UPS

This project develops a training system for safety for a process
June 15, 2015

Economic and Technical Feasibilities of Implementing Robotics in an Automotive Repair Environment – UA06-RRAD

Sponsor: Red River Army Depot Research Team: Earnest W. Fant Universities Involved: University of Arkansas Start Date: 03/01/06 End Date: 02/28/07 Summary: Identify process improvement by increasing productivity with the introduction of robotics in an automotive repair and component manufacturing environment. The approach follows a logical sequence of steps that […]
June 15, 2015

Phase II: Analysis of Material Handling, Storage, Transportation and Identification In Support Of Building 3705, Tinker AFB, Oklahoma – OU03-ALC

This project's purpose is to create a layout for the storage of large assets at a company's storage facility and to analyze different approaches for the material handling and storage of the horizontal and vertical assemblies of a company.
June 15, 2015

Truck Weight Enforcement using Advanced Weigh-in-Motion Systems – OU06-WIM

Sponsor: Oklahoma Department of Transportation Research Team: Jim Sluss, Robert C. Huck, Monte P. Tull, Thordur Runolfsson Universities Involved: University of Oklahoma Start Date: 05/01/06 End Date: 05/01/07 Summary: This project introduces Weigh-In-Motion (WIM) technology, a measurement system composed of sensors and scales of technology able to measure the actual […]
June 15, 2015

Process Control Analysis for Improved Supply Chain Reliability – LH06-LSBK

The objective of this project is to design a system that would achieve operational control within aprocess for improved supply chain reliability.
June 15, 2015

Identifying Logistics Educational Needs – UL03-02 Crane

The overall goal of the study was to assist in defining and assessing workplace competencies related to the field of logistics. With such an assessment, management should be capable of designing specific employee development plans and organization-wide programs to raise the level of logistics competency and performance in the organization.
June 15, 2015

Celdi Knowledge Management – CDP11-KM

Sponsor: Celdi IAB Research Team: Timothy Matis Universities Involved: Texas Tech University Start Date: 05/01/11 End Date: 12/31/12 Summary:
June 15, 2015

Traffic Sign Production and Inventory Logistics Study – MU11-MDOT1

This project project focuses on the development of optimization-based approaches to increase efficiencies in the sign distribution network of the Missouri Department of Transportation through comprehensive examination of warehouse and delivery locations, inventory volumes, and transportation logistics.
October 20, 2017

Variation Identification System for Operational Risks in Inventory Systems – CDP13-VISOR – Phase III

The main goal of this research is to review methods and software to deal with less than perfect information in the supply chain and to develop a software tool to enable analysts to better understand how data uncertainty can lead to risk in the supply chain.
October 20, 2017

Fabrication Division Logistics Process Modernization – UA14-RRAD – Phase III

The Red River Army Depot has identified their Fabrication Division as a candidate for logistics improvement and re-engineering activities that can improve work planning, material supply, and production capabilities.
October 20, 2017

Mitigating the Impact of Lead Time Variability – UA13-DLA – Phase III

The main goal of this research is to model the effect of lead-time variability on the DLA’s logistics system and to develop methods to incorporate this information into inventory policy setting and planning.