apsupport

June 15, 2015

Analytical Layout and Design of a Technological Repair Facility: A UPS-SCS Case Study – UL04-UPS

The objective of this research is to design a technological repair facility which provides a flexible layout that allows for optimal traveling and processing paths, ergonomic workstations, and appropriate software / tools from which to conduct repairs for a multi-client list of vendors.
June 15, 2015

Multi-State Selective Maintenance Decisions – YR2 UA04-AFRL4

The objective of this project is to develop multi-state selective maintenance models that incorporate multi-state component status and multiple measures of system performance
June 15, 2015

Quantifying the Impacts of Improvements to Prognostic and Diagnostic Capabilities – YR2 UA04-AFRL3

The objective of this project is to develop a methodology based on mathematical modeling for analyzing prognostic and diagnostic capabilities.